What customers say
Bergen Solar SolutionsSolar design and installation · Tenafly, NJ
Serving Tenafly and nearby towns
Tenafly, New Jersey
Bergen Solar Solutions is a solar service for Tenafly homeowners. Each quote would come with one written timeline for New Jersey's solar incentive registration, Tenafly's permits and PSE&G's switch-on, naming who files each step and by when. The state's residential incentive round closes when full or on June 1, 2027.
Get your free quote Open the deadline calendar
Private website concept.
Tenafly, New Jersey
Bergen Solar Solutions installs across Tenafly, Teaneck and the northern Bergen County boroughs, where the incentive registration and the utility interconnection set the schedule as much as the roof does. One timeline covers both, with the deadlines named.
What customers say
Serving Tenafly and nearby towns
What we do
Call or visit
| Phone | (571) 264-6965Call to book an assessment. |
|---|---|
| Office | 35 Riveredge Rd, Tenafly, NJ 07670Parking on site. |
| Estimates | Free, in writingDesign and price as separate documents. |
Why homeowners pick us
Our story
Installing across Tenafly, Teaneck, River Vale and Washington Township.
Where we work
The proposed split for an owned system. Two rules hold it together: nothing goes on the roof before the state's conditional acceptance letter, and nothing switches on before PSE&G says so.
Enter the date on a conditional acceptance letter, or one you expect, and your installer's estimate for the town-side work. The calendar applies PSE&G's Level 1 rule maximums and the ADI 12-month clock, then shows how much room is left.
Business days skip weekends only; holidays are not counted. Town-side weeks are your assumption, not a published clock. Illustrative calculation, not a schedule for any home.
In New Jersey, the paperwork decides the money. Install before the state accepts your incentive registration, or switch on before PSE&G authorizes it, and you can lose income the panels would otherwise earn. The pages that currently rank for Tenafly solar either say nothing about paperwork or promise it is "handled", without saying which filing comes first, who signs it, or what is lost if it slips. So before you compare panel brands, ask each installer: what gets filed, by whom, and by what date?
How we work. Bergen Solar Solutions would give every Tenafly home four written pieces, plus optional lines:
| Deliverable | Included or optional | What it answers |
|---|---|---|
| Incentive-first timeline | Included | Every filing from incentive registration to the property-tax form: portal or office, who files, who signs, the rule deadline, what is lost if it slips |
| Quote with incentive lines kept apart | Included | The solar-only price and its price per watt; incentive income on its own line; no federal credit line |
| Signing checklist | Included | Each document you sign, and the step it belongs to |
| Deadline calendar | Included | Your registration's expiry date, the one extension option, and your tasks after switch-on |
| Extra lines, priced separately | Optional | Help with your incentive accounts after switch-on, a battery program check, roof work, an electrical panel upgrade |
Service choices. The optional lines are priced on their own so you can drop any of them without changing the solar price. How you pay also changes the paperwork. With cash or a loan, you hold the incentive certificates and register for them yourself. Under a lease or power purchase agreement (PPA), the provider usually holds them and files some steps itself. The timeline records that choice first; it is an input, not a financing comparison.
Two rules shape every timeline: no installing before the state's conditional acceptance letter, and no switch-on before PSE&G says you may.
New Jersey's incentive for home solar is the Administratively Determined Incentive (ADI), which you may also see called SuSI. It pays in SREC-IIs: one certificate for every 1,000 kWh the system produces, for 15 years. As of November 2026, the ADI program page says registrations are open.
The "who files" column shows the split. Ask any bidder to fill it in with names. For a second view of the same paperwork, EcoGen's New Jersey solar incentives page has its own who-does-what table.
| Step | Where | Who files (proposed) | Who signs | Rule deadline | If it slips |
|---|---|---|---|---|---|
| 1. ADI disclosure form (purchase, lease or PPA version) | ADI portal | We'd prepare it | You | Before registration | Registration can't go in |
| 2. ADI registration | ADI portal | We'd file | You | Block open: until full or June 1, 2027 | This round's value may be gone |
| 3. Conditional acceptance letter | From the program | Program issues it | — | Review time not published | Building earlier is at your risk |
| 4. PSE&G Level 1 application, Part 1 | CIAP portal | We'd file | You | Rule: up to 16 business days if complete | Gaps unfixed in 15 business days withdraw it |
| 5. HPC or zoning approval, if needed | HPC; Building Department | We'd file | You | Before any permit application | No permit application |
| 6. Construction permit | Tenafly Construction Agency | We'd file | You and the contractor | Before work starts | Work can't start |
| 7. Installation and town inspections | Construction Official | We'd request them | — | 24 hours' notice per inspection | No sign-off, no Part 2 |
| 8. PSE&G Part 2 and inspection | PSE&G | We'd file | You | Inspection date within 13 business days | Switch-on waits |
| 9. Authorization to energize (PTO) | PSE&G | PSE&G issues it | — | Within 5 business days of a passed inspection | Running early: no payment for excess credits |
| 10. ADI post-construction package | ADI portal | We'd file | You | 12 months from the letter, one 6-month extension | Registration can expire |
| 11. PJM-GATS and InClime accounts | GATS; InClime | You (help is optional) | You | After the certification number | SREC-IIs don't reach you |
| 12. Form ST-4 | To the seller | You | You | At purchase | Sales tax charged on exempt equipment |
| 13. Form CRES | Tax assessor | We'd prepare it | You and the installer | After town sign-off | Added home value stays taxable |
The terms you'll meet in that table:
Why "no installing before the letter." The state rule, N.J.A.C. 14:8-11.4, requires conditional registration before construction begins unless the Board grants a waiver, and says earlier construction is "at the risk of the party(ies) involved." The program page reads "commencing construction" more narrowly, as getting PTO. The two readings differ, so the timeline follows the stricter one: no installing before the letter, and never PTO before it.
A zoning step before the building permit eats into the same 12 months. Teaneck, for example, issues a zoning control number before building permits, so a proposal there has to start earlier.
The assessment would take about 90 minutes on site plus a document check (illustrative duration, not a promised appointment length).
Bring: 12 months of PSE&G bills showing kWh; the name on the electric account and any third-party supplier; proof of who owns the house; roof age and repair records if you have them.
What it would check:
First, settle which money claims still hold. Some pages ranking for Tenafly solar still repeat outdated figures.
What moves a Tenafly quote: system size, roof complexity, layout limits from historic review, tree work, the electrical panel, and anything bundled into the headline, such as a battery, roof work or a panel upgrade. Ask for each of those as a separate line.
To check the solar part, use dollars per watt ($/W): the solar-only price divided by the system's DC watts (panel wattage times panel count). EcoGen's Solar Cost Index puts New Jersey at $2.92/W (state benchmark), a modeled installed price per watt, before incentives, September 2026 Edition. EcoGen's New Jersey cost data applies a quote range of 12% either side: $2.57 to $3.27/W (state benchmark range). EcoGen has no Tenafly figure, so the state number is the yardstick.
Illustrative example. Example figures only, not a price or estimate for any home. A Tenafly proposal lists 23 panels of 400 W (9,200 W DC) for $30,000, including a $2,400 main-panel upgrade.
Line (illustrative calculation) Amount $/W Headline price $30,000 $3.26 Less main-panel upgrade $2,400 Solar-only price $27,600 $3.00 State benchmark (EcoGen, September 2026) $2.92 (range $2.57 to $3.27) The headline $3.26/W sits just inside the top of the range. The solar-only $3.00/W is comfortably inside it, about 3% above the benchmark.
The incentive line (illustrative calculation): at EcoGen's statewide factor of 1,342 kWh per kW a year (unshaded), 9.2 kW makes about 12,346 kWh, or 12 SREC-IIs. At $77 that is about $924 in year one and about $13,860 over 15 years if output held steady. Treat that as a ceiling; a real proposal would model your roof's shade. Had the same system been registered before July 27, 2026, at $85, it would have earned about $1,440 more over 15 years. That gap is why the registration date belongs on the quote.
The $/W check tells you whether the price is fair. Whether that $924 a year ever arrives depends on the timeline.
Don't compare a lease or PPA quote's $/W with an owned system's; the provider usually keeps the SREC-IIs, so there is no incentive line for you.
Solar permits here are municipal, not county. The Tenafly Building Department handles zoning, building and other codes. Within it, the Tenafly Construction Agency enforces the Uniform Construction Code (UCC), the state building code. The town says permits come before work, and that some projects need prior approval from the Planning Board, Zoning Board of Adjustment or Historic Preservation Commission (HPC) "before any permit applications can be made."
| Approval | Office | When | What depends on it |
|---|---|---|---|
| Certificate of Appropriateness, if designated or in an overlay district | Historic Preservation Commission | First | Every permit application |
| Zoning permit, if required for a roof mount | Building Department | Before the construction permit | Not confirmed for solar: ask |
| Tree removal permit, if needed | Department of Public Works | Before removal | A layout that assumes less shade |
| UCC construction permit | Tenafly Construction Agency | Before work starts | Installation |
| Construction Official approval | Construction Official | After inspections | PSE&G Part 2 and Form CRES |
The historic step. The HPC reviews exterior changes to designated Historic Sites and properties in Historic Overlay Districts. Its 2012 design guidelines say panels should have "no impact or minimal impact" on historic appearance, advise placing them "so that they are not visible from public view", and list panels highly visible from the public right of way as not recommended. They are guidance, not rigid rules, and review is case by case. If your house is covered, plan a rear-roof layout and talk to the commission early, because its approval comes before every permit.
The town's process. Submit the applications with sketches and plans, post the permit at the site, request each inspection at least 24 hours ahead with the address and permit number, then receive the Construction Official's approval. The town's FastTrackGov portal shows permit and inspection records. Whether a solar application can be submitted there is not confirmed, so ask the Building Department.
A licensing check. New Jersey has no separate solar license. The electrical work needs a New Jersey electrical contractor license, and home-improvement sellers need Home Improvement Contractor (HIC) registration. Tenafly's electrical permit form asks for both numbers; check them against the company named on your contract.
Nearby towns start differently. In Rochelle Park, the Construction Official is also the Zoning Officer. Six New Jersey municipalities are named Washington Township, so confirm you have the Bergen County office for Washington Township. Coverage of towns outside Tenafly covers these towns.
Tenafly is PSE&G territory. A few spots on the northern edge, by the Cresskill line, fall inside Rockland Electric's mapped area, so check the utility on your bill before anyone files. Rockland Electric also serves part of River Vale, where the filing route differs from PSE&G's.
The BPU's interconnection rule, adopted January 2026, sets the Level 1 clocks:
The same rule spells out the penalty: unauthorized operation "will result in no payment for excess generation credits." PSE&G says you sign the interconnection agreement even when the contractor files it, the fee is invoiced once the application is complete, and the system stays off until the PTO notice.
What exports earn. Power you send to the grid earns credits that roll month to month until the end of an annualized period, a 12-month year you choose. Excess left then is paid at the avoided wholesale cost, which is below the retail rate. The system can't be sized above your annual use. Switching supplier ends the period early, so time any change around it. The BPU opened a net-metering review in November 2024; as of November 2026 no successor has been announced.
This is what the deadline calendar would look like for one house. The letter date and the town-side dates are assumptions; the clocks are the rule maximums above.
Illustrative example. Example dates only, not a schedule for any home. Assume the conditional acceptance letter is dated Monday, March 1, 2027, and the house needs no HPC hearing.
Step Rule clock Illustrative date Conditional acceptance letter ADI review time not published March 1, 2027 (assumed) PSE&G Part 1 filed — March 2, 2027 Signed Part 1 back Up to 16 business days if complete By March 24, 2027 Permit, installation, town inspections, Construction Official approval No published clock Assumed done by September 10, 2027 PSE&G Part 2 submitted After town approval September 13, 2027 PSE&G inspection Date no later than 13 business days after Part 2 By September 30, 2027 Authorization to energize Within 5 business days of a passed inspection By October 7, 2027 ADI post-construction package 12 months from the letter Due by March 1, 2028 Last date with the one 6-month extension Extension, if granted September 1, 2028
Read the calendar from the middle. The PSE&G steps have published maximums; the town-side row does not. The Department of Energy says permits and inspections can take weeks to months, and an HPC hearing, a tree permit or roof work would all land in that row. In this example the system switches on about seven months into the twelve, which leaves room. Push the town row back five months and, without the extension, the post-construction package is due before PSE&G has finished.
So a switch-on date promised before the acceptance letter is a guess. Ask for date ranges tied to each triggering step, and ask which row the installer expects to take longest.
A working system earns no SREC-IIs until the accounts exist. After the post-construction package is accepted, the program emails an NJ certification number. You then register with PJM-GATS, which records production and issues the certificates, and with InClime, the SREC-II Administrator. The ADI program FAQs are plain: customers "should never assume that the solar installer will manage their account." EcoGen's New Jersey incentives page notes that monthly meter readings go to GATS. Ask who enters them.
The Department of Energy's guide to buying a house with solar suggests these checks, and they apply just as well to a new system:
Ask every bidder in writing which warranties cover panels, inverter and roof penetrations, and who honors each. We have no warranty terms yet.
Use these with any Tenafly bidder, alongside the quote checklist on this site.
Red flags: a "30% tax credit" on an owned system; "free solar" or "$0 out of pocket" sold as a state program; an SREC-II above $77 for a new registration; "we manage your account" with no named person; "county permits", when approvals are municipal.
How long does going solar take in Tenafly? No one can promise a date before the acceptance letter, because the ADI review time is not published. After it, PSE&G's rule clocks add up to about 16 business days for Part 1 and 18 from Part 2 to switch-on. Town approvals are the open-ended part.
What happens to the SREC-IIs if I sell the house? A sale needs a PJM-GATS transfer (Schedule A), per the ADI program FAQs. Keep the certification number, GATS details, permits and warranties for the buyer.
How do I check an installer's reputation? Start with the records. Look up the electrical license and HIC registration in New Jersey's Division of Consumer Affairs license search, check that they match the company on the contract and the permit, and check that its timeline names who files each step.
What if the block fills before I register? There is no waiting list, and the next round's value is unknown as of November 2026. Check the block status on the ADI portal before you sign.
Is Bergen Solar Solutions an installer today? Not yet. It is a service. Nothing here is a quote, a license claim, a warranty or a promise of approval.
Each town adds its own step to the same timeline: a zoning number, a shared zoning and construction office, a second utility, a name shared with five other towns. Coverage outside Tenafly is proposed and not confirmed.
Pick your town and the kind of quote. The site builds the checklist to bring to any installer's visit, with your town's extra step at the top. It runs on this device: nothing is sent or stored.